Banner Images

TIP...
of the Iceberg

Soldering copper

Your solder should always be placed on the opposite side of the pipe where the flame is directed.…

Our PROJECTS

Allied 40 kw Electric Boiler

Commercial hydronic multi boiler install with allied electric boilers

Allied 40 kw Electric Boiler

Frequently Asked QUESTIONS

FAQ

Do I need a building permit when installing a wood stove?

The local authority having jurisdiction, also known as the building inspector, has indicated that all wood-fired appliance installations require a building permit. This ensures the installation meets local building codes and also allows for a WETT inspection if required by your insurance carrier.

read details
Exceliner Chimney

Exceliner Chimney

Superior Quality Construction

  • Continuously welded seams - no leaks, no possibility of seam separation
  • Continuously welded seams - no leaks, no possibility of seam separation
  • Type 304 stainless steel
  • All stainless steel components
  • Factory hemmed ends - smooth, safe surfaces - no more cuts
  • All stainless steel rivets provided with each liner section
  • All stainless steel rivets provided with each liner section
  • Pre-punched holes - no drilling required
  • Easy to install
  • Lifetime Warranty