Banner Images

TIP...
of the Iceberg

Know where your main water shutoff is located

Make a point of locating your main water shutoff, ensure it is well labelled and advise everyone…

Our PROJECTS

Allied 40 kw Electric Boiler

Commercial hydronic multi boiler install with allied electric boilers

Allied 40 kw Electric Boiler

Frequently Asked QUESTIONS

FAQ

I have existing gray water line but it is hard to find, where can I find more?

The gray water line is Polybutylene (Poly-B for short) and is no longer manufactured.

read details

Renaissance Fireplace Installation

Model 1500 Renaissance Rumford installed in a Great Room \

Model 1500 Renaissance Rumford installed in a large bedroom